12 October 2011

Log Entry 7, 12 October 2011

Today, the VEXRobotics team worked with Mr. Alfonse to establish what was necessary to complete for the report on the alternate solutions. It was decided that extremely specific descriptions and detailed drawings would be graded to further evaluate these solutions. After planning three different alternate solutions with both land and water advantages, isometric sketches were detailed and completed. Still to create are orthographic images, as well as detailed inlets to further describe materials and proceedures in the VEXRobot.

0 comments:

Post a Comment

 
Design by Free WordPress Themes | Bloggerized by Lasantha - Premium Blogger Themes | Blogger Templates